【24h】

THE CONSTRUCTION OF ERTAN DAM

机译:二滩大坝的建设

获取原文

摘要

Ertan Hydropower Station is the largest power station completed in the 20th century in China and the 240m high Ertan double-curvature concrete arch dam ranks No.3 in the world. Because of the World Bank loan, Ertan Joint Venture Sponsored by Impregilo Italy. was chosen as the contnactor to Implement construction of Entan dam through the international competitive bidding. The construction of dam introduced top level construction and management experience. This article describes whole process of the dam construction including the preparatory work, excavation and treatment of the dam foundation, placement of dam concrete in detail. The experience of Ertan dam could provide beneficiary reference to similar project.
机译:Ertan Hydropower Station是中国20世纪已完成的最大电站,240米高的Eartan双曲率混凝土拱坝在世界上排名第3。由于世界银行贷款,Eltan合资企业由Impregilo意大利赞助。被选为通过国际竞争性竞标实施Entan大坝建设的问题。大坝建设推出了顶级建设和管理经验。本文介绍了大坝施工的全过程,包括坝基的准备工作,挖掘和处理,详细放置坝混凝土。 ERTAN DAM的经验可以为类似项目提供受益人。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号