THE KEY TECHNIQUE OF LONG SHOU 2ND STAGE HYDROPOWER STATION CONSTRUCTION

机译:龙寿第二阶段水电站施工的关键技术

获取原文

摘要

Ngshou 2nd Stage Hydropower Station in Gan Su Provice lies in the very cold and often earthquake and dry region, the mountain is steep, the dam type is seldom seen grotesquely type concrete face rockfill dam,the biggest dam height 146.5 m, construction term is rather bad, and the work period is short, and the mission is heavy. For insure the construction speed and the quantity, through the cautiously analysising with the argument,we change the high digitated wall's normal concrete to RCC and adopt the technique of cave blowing up in the moraine material . This makes construction speed greatly. Counteract that extruded wall fored normal regulations of the front-panel dam upper stream ramped to start construction method.Construction practice shows that the mat layer material with extruded wall do not take place breaking away phenomenon and combine to stipulation concrete front-panel very small, that have no need to draw brushing the pitch the etc. to insulate.At the same time in the digitated plank, discharge tower of release excessive tunnel reinforcing bar under construction adopt the technique of the strong straight screw thread in reinforcing bar etc. conjunction, so we get the good result of construction term and profit.
机译:甘苏省的Ngshou第二阶段水电站位于非常寒冷,往往的地震和干燥区域,山陡,坝型很少见到巧妙的混凝土脸堆石坝,最大的坝高146.5米,施工术语相当糟糕,工作时期很短,任务很重。为了确保施工速度和数量,通过谨慎缩短的论点,我们将高位数字墙的正常混凝土变为rcc,采用冰碛材料吹出的洞穴技术。这极大地使施工速度变得巨大。抵消挤压墙造成的正常规则的前面板坝上游斜坡启动施工方法。构建实践表明,垫子层材料与挤压墙不发生断开现象,并结合规定混凝土前面板非常小,这无需绘制刷子等等以防止。在数字化板中同时,释放过度隧道加强杆的排放塔正在建设中采用加强杆等强直线螺纹的技术。结合,所以我们得到了建设期限和利润的良好结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号