首页> 外文会议>International Conference on Hydropower >RESEARCH ON FACE SLAB DRY CONTRACTION STRESS OF ROCK-FILL DAM WITH CONCRETE FACE SLABS IN ITS CONSTRUCTION PERIOD
【24h】

RESEARCH ON FACE SLAB DRY CONTRACTION STRESS OF ROCK-FILL DAM WITH CONCRETE FACE SLABS IN ITS CONSTRUCTION PERIOD

机译:岩石填埋水坝脸部平板干收缩应力与混凝土面板施工期

获取原文

摘要

In combining with Gongboxia concrete face rock-fill dam and in considering each factor affecting humidity and dry contraction stress, the face slab construction process is, in real time, simulated in terms of the fact that whether there are two kinds of operational conditions (states) of surface maintenance and repair or not in the face slab concrete placement. Also, the finite element simulation analysis is made of the complete process of humidity field and dry contraction stress of face slabs whereby obtaining the face slab humidity fields and dry contraction stress variations and distribution pattern during the construction period.
机译:在与GongBoxia混凝土面岩填充大坝结合时,考虑到影响湿度和干收缩应力的每种因素,实时脸部平板施工过程是在事实上模拟,即有两种操作条件(州) )表面维护和修理或不在面板中的混凝土放置中。 而且,有限元模拟分析由湿度场的完整过程和面板的干收缩应力制成,从而在施工期间获得面板湿度场和干收缩应力变化和分布图案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号