Geotechnical Construction in a Complex Urban Setting The Boulevard of the Allies, Pittsburgh, Pa

机译:复杂城市环境中的岩土工程建设宾夕法尼亚州匹兹堡的同盟林荫大道

获取原文

摘要

This paper highlights geotechnical construction activities completed during the rehabilitation of the Boulevard of the Allies in Pittsburgh, Pennsylvania. The urban setting of this project presented unique construction challenges involving equipment mobility, temporary loading of existing structures and the requirement for suspended drill rig platforms for the installation of rock bolts along a 100-foot high rock slope known locally as the Duquesne Bluff. Additionally, this paper discusses the construction of new concrete cantilever structures founded at the crest of the near vertical rock slope, the use of pin pile foundations, pile load testing procedures and results, rock fall fence construction and rock slope netting installation. Through owner, designer and contractor cooperation, this project was completed within the $11.2M budget and ahead of month schedule. Recently the project was selected for the 2002 Outstanding Highway Achievement Award by the Pittsburgh Section of the American Society of Highway Engineers.
机译:本文重点介绍了宾夕法尼亚州匹兹堡的同盟林荫大道修复期间完成的岩土施工活动。该项目的城市环境带来了独特的施工挑战,涉及设备机动性,现有结构的临时载荷以及要求在沿当地人称为Duquesne Bluff的100英尺高的岩石坡道上安装锚杆的悬挂式钻机平台。此外,本文还讨论了在近垂直岩质边坡顶部建立的新型混凝土悬臂结构的施工,销桩基础的使用,桩身测试程序和结果,防落石围墙的施工以及岩质边坡网的安装。通过业主,设计师和承包商的合作,该项目在1120万美元的预算内完成,并且提前完成了计划。最近,该项目被美国公路工程师协会匹兹堡分会评选为2002年杰出公路成就奖。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号