A review of software surveys on software effort estimation

机译:评估软件工作量估算的软件调查

获取原文

摘要

This paper summarizes estimation knowledge through a review of surveys on software effort estimation. Main findings were that: (1) most projects (60-80%) encounter effort and/or schedule overruns. The overruns, however, seem to be lower than the overruns reported by some consultancy companies. For example, Standish Group's "Chaos Report" describes an average cost overrun of 89%, which is much higher than the average overruns found in other surveys, i.e. 3040%. (2) The estimation methods in most frequent use of expert judgment is that there is no evidence that formal estimation models lead to more accurate estimates. (3) There is a lack of surveys including extensive analyses of the reasons for effort and schedule overruns.
机译:本文通过回顾有关软件工作量估算的调查总结了估算知识。主要发现是:(1)大多数项目(60-80%)遇到工作量和/或进度超支。但是,超支额似乎低于某些咨询公司报告的超支额。例如,斯坦迪什集团(Standish Group)的“混乱报告”描述了平均费用超支89%,这远远高于其他调查中发现的平均超支3040%。 (2)最常使用专家判断的估算方法是,没有证据表明正式的估算模型会导致更准确的估算。 (3)缺乏调查,包括对努力原因和进度超支的广泛分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号