首页> 外文会议>IADC/SPE drilling conference >Cost-Effective Subsea Drilling Operation on the Smallest Norwegian Field Development
【24h】

Cost-Effective Subsea Drilling Operation on the Smallest Norwegian Field Development

机译:在挪威最小的油田开发中具有成本效益的海底钻井作业

获取原文

摘要

Drilling and completing 4 horizontal and one vertical injectionwell during the months from October 2000 to May 2001 costeffectivelydeveloped the Glitne subsea field in the NorwegianContinental Shelf. The operation was completed six weeksahead of budget time and included an extended drillingprogramme of additional 5000 m compared to thedevelopment plan.This paper will focus mainly on the drilling operation andwhy it succeeded. It will also include a brief description of thewhole field development solution. As time is the main costdriver on a subsea operation, beating the time schedule wasthe primary goal for this operation. The drilling programmefocused on a well planned and effective batch drillingoperation for all hole sections, and the extended use of costeffectiverotary steerable assemblies.
机译:钻完并完成4个水平和1个垂直注入 在2000年10月至2001年5月的几个月内 在挪威开发了Glitne海底油田 陆架。手术完成了六个星期 在预算时间之前进行,并包括延长的钻探时间 与 发展计划。 本文将主要侧重于钻井作业和 为什么成功。它还将包括对 整个领域的开发解决方案。由于时间是主要成本 驾驶员在一次水下作业中击败了时间表 此操作的主要目标。钻孔程序 专注于精心计划和有效的批处理钻探 所有孔段均可操作,且扩展使用具有成本效益 旋转转向总成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号