首页> 外文会议>SPE/IADC drilling conference >Offshore Drilling Experience with Dual Derrick Operations
【24h】

Offshore Drilling Experience with Dual Derrick Operations

机译:双重井架作业的海上钻井经验

获取原文

摘要

Smedvig took delivery of the fully class 3 dynamic positioned new generation drilling units West Navion and West Venture in Fegruary 2000. Both are equipped with full capacity dual Ramrigs with the dapability of running two strings in the water simultaneously. In a single well application the advantage lies in using the dual system for parallel making and breaking bottomhole assemblies, tool strings and pipestands and in running casing/BOP in parallel with drilling top hole. In a multiwell subsea template situation there is an additional potential in performing simultaneous in-water opeerations. While the main rig is in a BOP/riser drilling mode, the auxiliary rig can drill tophole and install surface casings in the next well. With proper planning, this could imply subsequent moving the BOP to the next well without having to come back to surface. In later phases the Xmas tree or other modules may be installed in other slots/positions in parallel with the main activity. The paper describes enhancement of drilling operations through a selection of cases that are experienced and proves that utilisation of the dual activity feature leads to a paradigm shift in drilling and completion operations.
机译:Smedvig在2000年Fegruary交付了全3级动态定位的新一代钻井装置West Navion和West Venture。它们都配备了全能力的双Ramrigs,可以同时在水中运行两根管柱。在单井应用中,优点在于使用双重系统来平行制作和破坏井底组件,工具柱和管架,以及在与钻探顶孔平行的情况下运行套管/ BOP。在多孔海底模板情况下,同时进行水上作业还有额外的潜力。当主钻机处于防喷器/立管钻探模式时,辅助钻机可以钻出顶孔并在下一个井中安装地面套管。如果进行了适当的计划,这可能意味着随后需要将BOP移至下一口井,而不必重新浮出水面。在以后的阶段中,可以将Xmas树或其他模块与主要活动并行地安装在其他插槽/位置。本文介绍了通过选择一些经验丰富的案例来增强钻井作业的方法,并证明了双重活动特征的利用会导致钻井和完井作业的范式转变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号