首页> 外文会议>Sixth Biennial IEEE-USA Careers Conference, 1989., 1989 >New layout of the rings for the 0.5 MW/10 Hz/50 Hz AUSTRONspallation source
【24h】

New layout of the rings for the 0.5 MW/10 Hz/50 Hz AUSTRONspallation source

机译:用于0.5 MW / 10 Hz / 50 Hz AUSTRON的环的新布局散裂源

获取原文

摘要

In 1993-94 a feasibility study for AUSTRON, a neutron spallationsource, was made. At that time the machine was a synchrotron cycling at50 Hz and delivering an average beam power of 410 kW at 1.6 GeV. In1998, the Austrian Government decided to contribute one third of thetotal cost of the facility and invited international partners toparticipate. In 1999, a more ambitious upgrading of the original conceptwas proposed aiming at 0.5 MW, pulsed at either 50 Hz or 10 Hz. Theslower repetition rate is achieved by the addition of a storage ringholding four consecutive (single bunch) pulses from the 50 Hzsynchrotron until a fifth pulse is accelerated and transferred to thetarget with the four stored ones, hereby increasing the intensity perpulse by a factor 5. The resulting 5-bunch pulse duration is 1 μs.The choice of the geometry is discussed, and the lattice design for thestorage ring and the transfer line from the synchrotron presented. Alsoaddressed are the critical longitudinal aspects resulting from themandatory use of harmonic number one
机译:在1993-94年,对中子散裂AUSTRON进行了可行性研究 来源,已制成。当时的机器是一个同步加速器 50 Hz并在1.6 GeV时提供410 kW的平均光束功率。在 1998年,奥地利政府决定捐助三分之一的 设施的总成本和邀请的国际合作伙伴 参加。 1999年,对原始概念进行了更宏大的升级 提出的目标是0.5 MW,脉冲频率为50 Hz或10 Hz。这 通过增加存储环可以降低重复频率 保持来自50 Hz的四个连续(单束)脉冲 同步加速器,直到第五个脉冲被加速并传输到 以四个存储的目标为目标,从而增加了每一个的强度 脉冲的倍数为5。所得的5束脉冲持续时间为1μs。 讨论了几何形状的选择,并讨论了晶格的设计。 存储环和来自同步加速器的传输线介绍。还 解决的是关键的纵向方面 强制使用第一谐波

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号