首页> 外文会议>World multiconference on systemics, cybernetics and informatics;SCI 2000 >INVESTIGATION OF IMPACTS OF DYNAMIC CONCURRENCE ON DEVELOPMENT PROJECT MANAGEABILITY
【24h】

INVESTIGATION OF IMPACTS OF DYNAMIC CONCURRENCE ON DEVELOPMENT PROJECT MANAGEABILITY

机译:动态关注对开发项目可管理性的影响的调查

获取原文

摘要

Shrinking cycle time with concurrent engineering can make projects more difficult to manage. However, the extent, nature and conditions of the causal relationship between concurrence and manageability are not well understood. This research uses degree of concurrence and degree of concurrence relationship curvature as two measurements of dynamic concurrence based on Process Concurrence Relationship, an improved tool for describing and modeling concurrence, and uses the standard deviation of process work queue acceleration as Manageability Index to model project manageability. Single-phase development process model is applied as a data collection tool to investigate the causal relationship between concurrence and manageability. Two hypotheses were developed to test the causal relationship separately with the two different experiments - Linear and Nonlinear. The research finds a significant inverse relationship between degree of concurrence and project manageability with linear concurrence relationship. When the concurrence relationship was changed from linear to nonlinear the relationship became quite unexpected. The results improve the understanding of the causal relationship between dynamic concurrence and manageability.
机译:并行工程缩短了周期时间,使项目更难以管理。但是,对并发性和可管理性之间的因果关系的程度,性质和条件还没有很好的了解。本研究使用并发度和并发关系曲率作为基于过程并发关系的动态并发的两个度量,这是一种用于描述和建模并发的改进工具,并使用过程工作队列加速的标准偏差作为可管理性指标来建模项目可管理性。 。将单阶段开发过程模型用作数据收集工具来研究并发性与可管理性之间的因果关系。提出了两个假设以分别通过两个不同的实验(线性和非线性)检验因果关系。研究发现,线性程度的并发程度与项目可管理性之间存在显着的反比关系。当并发关系从线性更改为非线性时,这种关系变得非常出乎意料。结果提高了对动态并发与可管理性之间因果关系的理解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号