首页> 外文会议>Offshore technology conference;OTC 2000 >Garden Banks 388 Abandonment - Technical Aspects Covering Pigging and Flushing Operations
【24h】

Garden Banks 388 Abandonment - Technical Aspects Covering Pigging and Flushing Operations

机译:花园银行388废弃-涵盖清管和冲洗操作的技术方面

获取原文

摘要

EEX Corporation decommissioned their Cooper Field Development during the summer of 1999. As part of the decommissioning activities, the subsea flowlines, gathering pipelines and export pipelines were pigged, flushed with inhibited seawater, and removed from service. All pumping operations were performed from the Floating Production Facility (FPF) "Enserch Garden Banks", which was moored at the host template in Garden Banks Block 388, in 2,200 feet of water. Unique to this phase of the decommissioning project was the use of a gel pig in conjunction with foam pigs to clear and flush the oil gathering pipeline.
机译:EEX公司于1999年夏季停止了库珀油田的开发。作为退役活动的一部分,对海底输油管线,集水管线和出口管线进行了清管,用抑制海水冲洗并停止使用。所有抽水操作均通过浮动生产设施(FPF)“恩瑟希花园银行”执行,该设备停泊在花园银行388区块的主机模板中,水深2200英尺。退役项目此阶段的独特之处在于,将凝胶清管器与泡沫清管器结合使用以清理和冲洗集油管道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号