Complete Coupled Fluid Flow and Stress Analysis for Xiluodu Hydro Project

机译:溪洛渡水利枢纽工程全耦合渗流与应力分析

获取原文

摘要

Complex hydrogeological conditions exist in the dam site of Xiluodu power station. This paper describes the joint rock masses as equivalent continuum medium and establishes the complete coupled control equations of seepage and elasto-plastic deformation. The coupled analysis of the dam site shows: the seepage field at the site varies during the proces of water impoundment of the reservoir, water pressure increases at the head of grottos and so does the seepage discharge on the wall of grottos. In the area of dam foundation, the seepage field calculated by the coupled method is obviously different from the one by the uncoupled mehtod. Besides, the sliding resistance of rock joints decreases, which causes unfavorable effects on the dam safety.
机译:溪洛渡水电站坝址存在复杂的水文地质条件。本文将节理岩体描述为等效连续介质,并建立了渗流与弹塑性变形的完整耦合控制方程。坝址的耦合分析表明:在水库蓄水过程中,该坝址的渗流场会发生变化,在岩洞顶部的水压会增加,而在岩洞壁上的渗流也会增加。在坝基区域,采用耦合法计算的渗流场明显不同于采用非耦合法计算的渗流场。此外,节理岩的滑动阻力减小,对大坝安全造成不利影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号