首页> 外文会议>Conference on display technologies >The partial plane level of terrace and its test
【24h】

The partial plane level of terrace and its test

机译:露台的局部平面水准及其测试

获取原文

摘要

At present, the way to test plane level of terrace are all indirect surrey methods at first, author choose some survey sections and get dates from these sections according to stipulation with survey method and then proceeding the dates, through which can strive the plane level error. The plane level dates Calculated with these dat4es can't make an overall plane level assessment to the terrace, especially to the partial position so, it can't be describe in detail on all terrace because of not been survived usually. Author all the error and plane level in the partial range the partial plane level, its assessment is very important to control the microcosmic quality. The paper also discuss the theory issue on speckle method and plane fluctuate capacity method with exist for a long term;
机译:目前,测试平台平面水准的方法都是间接的萨里法,作者选择了一些调查断面,并根据调查方法的规定从这些断面中获取日期,然后进行数据处理,以解决平面水准误差的问题。 。用这些dat4es计算的平面日期无法对平台(尤其是局部位置)进行整体平面评估,因此,由于通常无法幸存,因此无法在所有平台上进行详细描述。作者将所有误差和平面高度都在部分平面内,其评估对于控制微观质量非常重要。本文还讨论了长期存在的关于散斑法和平面波动能力法的理论问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号