【24h】

Wheeling charge under a deregulated environment

机译:在放松管制的环境下搬运费用

获取原文

摘要

Today's electric power industry is undergoing many fundamental changes due to the process of deregulation. Traditionally, electric power systems in many countries were structured in a single vertically integrated company for providing electric power to their customers based on cost-of-service. However, a number of countries have implemented or are implementing a free market deregulated industry in recent years. It is strongly believed that deregulation will have profound and important implications on technology within the electric power industry and the operation of industrial systems. Therefore, industrial sectors need to re-evaluate potential impacts and strategies of operation under a deregulated environment. One of the most exciting opportunities for the customer is the implementation of wholesale and retail wheeling. With this change, customers will have the option to purchase services and energy from different sources. However, before exercise this right, one has to understand the possible costs and risks associate with this right. From the economic point of view, lower energy cost does not necessarily mean lower utility cost. The cost of wheeling charges and other factors have to be figured into the calculation. Since it is impossible to color the electron, there is no standard formula to calculate wheeling charges within the utility industry. This paper discusses several commonly used wheeling calculation methods used by utility companies. A numerical example is provided to illustrate the Vector Absolute Mega-Watt Mile (VAMM) method that is used by the Electric Reliability Council of Texas (ERCOT).
机译:由于放松管制的过程,当今的电力行业正在发生许多根本性的变化。传统上,许多国家/地区的电力系统由一个垂直整合的公司组成,用于根据服务成本向其客户提供电力。但是,近年来,许多国家已经实施或正在实施自由市场放松管制的产业。人们坚信,放松管制将对电力行业的技术和工业系统的运行产生深远而重要的影响。因此,在放松管制的环境下,工业部门需要重新评估潜在的影响和运营策略。对于客户而言,最激动人心的机会之一是实施批发和零售运输。通过此更改,客户可以选择从不同来源购买服务和能源。但是,在行使这项权利之前,必须先了解与这项权利相关的可能成本和风险。从经济角度来看,较低的能源成本并不一定意味着较低的公用事业成本。推算费用和其他因素必须计入计算中。由于不可能给电子着色,因此在公用事业行业中没有标准公式可以计算出车轮电荷。本文讨论了公用事业公司使用的几种常用的转轮计算方法。提供了一个数值示例来说明德克萨斯电气可靠性委员会(ERCOT)使用的矢量绝对兆瓦英里(VAMM)方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号