首页> 外文会议>Industry Applications Conference, 2000. Conference Record of the 2000 IEEE >Independent power producers (IPP) perspectives and experiences with WSCC requirements for generator model validation tests
【24h】

Independent power producers (IPP) perspectives and experiences with WSCC requirements for generator model validation tests

机译:独立发电商(IPP)对WSCC发电机模型验证测试的要求的观点和经验

获取原文

摘要

After two regional blackouts in 1996, The Western Systems Coordinating Council (WSCC) instituted guidelines to verify that, for grid connected generators, the stated data represents accurate information that could reliably be used in the dynamic modeling of the system. This paper demonstrates an experience with the applications of WSCC's test guidelines to mid size units built and commissioned by independent power producers (IPPs). The paper addresses concerns with the excitation and voltage control systems and their limitations. An example of a generation unit connected at the end of a long line is discussed to demonstrate variances associated with testing and operating under extreme conditions. The concerns and issues discussed are of importance to IPPs beyond the WSCC's system as many other reliability councils are adopting rules similar to those established by WSCC.
机译:在1996年发生两次区域停电之后,西方系统协调委员会(WSCC)制定了准则,以验证对于并网发电机而言,所述数据代表可以可靠地用于系统动态建模的准确信息。本文展示了将WSCC测试指南应用于由独立发电商(IPP)建造和委托的中型机组的经验。本文解决了与励磁和电压控制系统有关的问题及其局限性。讨论了在长线末端连接的发电单元的示例,以演示与在极端条件下进行测试和操作相关的差异。讨论的关注点和问题对于WSCC系统之外的IPP至关重要,因为许多其他可靠性委员会正在采用与WSCC制定的规则类似的规则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号