首页> 外文会议>World tunnel congress >Report on the construction of the triple circular-face shield tunneling at Iidabashi Station (provisional name) on Metropolitan Subway Route 12
【24h】

Report on the construction of the triple circular-face shield tunneling at Iidabashi Station (provisional name) on Metropolitan Subway Route 12

机译:大都会地铁12号线饭田桥站(临时名称)三层圆形盾构隧道施工报告

获取原文

摘要

In comparison with the circular face shield tunneling, the triple circular-face shield cannot expect an sufficient arching effect at the face. To compensate this drawback, we previously evaluated potential adverse effects of the ground alteration on the surrounding structures by means of the finite element method-based analysis of the ground alterations, and took protective measures for them, along with the management of measurements on the works. We adopted an unprecedneted integrated-girder linign structure for the platform works, featuring integration of a girder structure into the segments.
机译:与圆形面罩隧穿相比,三重圆形面罩不能期望在面处具有足够的拱形效果。为了弥补这一缺陷,我们先前通过基于有限元方法的地面变化分析评估了地面变化对周围结构的潜在不利影响,并针对这些变化采取了保护措施,并管理了工程中的测量值。我们在平台工程中采用了无先例化的集成梁线性结构,其特征是将梁结构集成到各部分中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号