首页> 外文会议>World tunnel congress >Western Oslofjord sewerage scheme. Sub-sea breakthrough for the Lysaker Outfall System
【24h】

Western Oslofjord sewerage scheme. Sub-sea breakthrough for the Lysaker Outfall System

机译:西部奥斯陆峡湾污水处理系统。 Lysaker排污口系统在海底的突破

获取原文

摘要

The outlet overflow system from the Oslo's underground sewerage tunnel system has been constructed to handle excess flows to the main sewage treatment plant at VEAS, Slemmestad. The Lysaker outlet overflow system consist of a 190 m long access tunnel, a 22 m long intake shaft, a 611 m long sub-sea outfall tunnel and a 18 m long inclined outlet shaft. The sub-sea tunnel has a cross sectional area of 19 m~2 and the outlet shaft 10 m~2. The deepest elevation of the sub-sea tunnel is -74 m.a.s.l. The inclined outlet shaft towards the seabed of the Lysaker fjord has a submarine breakthrough at elevation -25 m.a.s.l.
机译:奥斯陆的地下污水管道系统的出口溢流系统经过精心设计,可以处理流向位于Slemmestad的VEAS的主要污水处理厂的多余水流。 Lysaker出口溢流系统包括一条190 m长的通道,一条22 m长的进水井,一条611 m长的海底出水管和一条18 m长的倾斜出水井。海底隧道的横截面积为19 m〜2,出口井为10 m〜2。海底隧道的最深处是-74 m.a.s.l.朝Lysaker峡湾海底倾斜的出水竖井在-25 m.a.s.l处有海底突破口。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号