首页> 美国政府科技报告 >Shanghai Sewerage Outfall Project. Final Technical Report.
【24h】

Shanghai Sewerage Outfall Project. Final Technical Report.

机译:上海污水排污口项目。最终技术报告。

获取原文

摘要

The study was conducted on behalf of the Shanghai Sewerage Project Construction Company. The primary purpose of the study was to find ways to improve the water quality in Shanghai's Suzhou Creek and Huangpu River in order to meet national standards. The report is an assessment of the feasibility of achieving the stated objectives through the implementation of an industrial pre-treatment program in which wastewater flows currently entering Suzhou Creek and the Huangpu River would be intercepted and, following pre-treatment, discharged through an outfall in the Chang Jiang River at Zhu Yuan. It is divided into the following sections: (1) Introduction; (2) Scope of Work; (3) Major Project Meetings and Consultations; (4) Functional Requirements of the Outfall System; (5) Functional Design and Hydraulics of the Outfall System; (6) Diffuser Risers and Ports; (7) Outfall Structure and Construction; (8) Mathematical and Physical Modeling; (9) Environmental Assessment of the Outfall Site.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号