首页> 外文会议>World tunnel congress >Subway construction using the removable three-centered slurry shield method
【24h】

Subway construction using the removable three-centered slurry shield method

机译:使用可移动的三心式泥浆盾构法进行地铁施工

获取原文

摘要

The engineering technology used in shield methods has made significant progress. The introduction of a multi-circle shield machine is being positively promoted for use as a means to enable rational construction of station sections of subway tunnels. In general, multi-circle shield sections are mostly short, so that advantages of this method are lost in terms of economical feasibility. In order to utilize one shield machine with maximum effectiveness, the removable three-centered slurry shield method has been developed. In this method, a removable type side shield machine is installed on both sides of a shield machine for excavation of a double-track cross section, to excavate multi-circle cross sections comprising double-track cross sections and station sections. This paper describes how this method was effectively employed for Subway No. 7 under construction in Tokyo. It will also discuss results of experimental research.
机译:屏蔽方法中使用的工程技术已取得重大进展。积极推广使用多圆盾构机,以作为合理构造地铁隧道站段的一种手段。通常,多圈屏蔽部分通常很短,因此就经济可行性而言,这种方法的优势丧失了。为了最大程度地利用一台盾构机,已经开发了可移动的三中心泥浆盾构方法。在这种方法中,可移动型侧屏蔽机安装在屏蔽机的两侧,用于挖掘双轨截面,以挖掘包括双轨横截面和工段的多圆形横截面。本文描述了这种方法如何有效地应用于东京正在建设的7号地铁。它还将讨论实验研究的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号