首页> 外文会议>International Erosion Control Association conference >Bioengineering to Stabilize Streambank Dredge Spoil
【24h】

Bioengineering to Stabilize Streambank Dredge Spoil

机译:生物工程稳定河岸挖泥

获取原文

摘要

Bioengineering techniques were used to stabilize dredge spoil placed to repair a streambank eroded by surface water from a logging road. The site was a 300-foot wide, 50-foot high 2:1 bank on the Allegheny River in Rimer, northern Armstrong County, Pennsylvania. The Glacier Sand and Gravel Company performed the dredging operation and the Armstrong County Soil Conservation District recruited volunteers from a variety of sources to establish the planting. Plant materials were supplied by the USDA Natural Resources Conservation Service plant materials centers in Big Flats, New York; Quicksand, Kentucky; and Cape May, New Jersey. Wattles of 'Streamco' purpleosier willow and 'Bankers' dwarf willow were planted at the bottom of the slope in three rows 2 fee t apart.
机译:生物工程技术用于稳定疏浚掠夺者,以修复来自伐木道路的地表水侵蚀的流犬。该网站宽300英尺,位于宾夕法尼亚州北部阿姆斯特朗县的Rimer的Allgheny河上的50英尺高2:1银行。冰川沙子和碎石公司的疏浚作业和阿姆斯特朗县土壤保护区从各种来源招募志愿者建立种植。纽约大公寓的美国农业部自然资源保护服务厂材料中心提供植物材料;肯塔基州Quicksand;和开普梅,新泽西州。 'Streamco'Purpleier Willow和'银行家的矮人柳树的魔法被种植在三排2的坡度底部。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号