首页> 外文会议>International conference on hydropower;Waterpower'97 >Needs for sediment management at non-federal reservoirs
【24h】

Needs for sediment management at non-federal reservoirs

机译:非联邦水库的沉积物管理需求

获取原文

摘要

This paper was prepared based on the Federal Energy Regulatory Commission's (FERC) analyses of data from a reservoir sedimentation survey by the Electric Power Research Institute (ERRI) of primarily non-Federal reservoirs in the United States. The three primary purposes. of the joint FERC and EPRI efforts are to 1) ascertain the scope and seriousness of sedimentation problems in the reservoirs, 2) explore the feasibility of applying modern technologies to mitigate sedimentation problems, and 3) to determine the needs for technical guidelines to assist FERC staff in licensing of hydroelectric projects with reservoir sedimentation problems and to assist hydropower operators in protecting valuable hydro resources from sediment damages. The results of the survey are summarized which indicate that 25 percent of hydropower reservoirs are negatively impacted by sedimentation. In addition, steps that can be undertaken by reservoir operators to assess the scope and impacts of their sediment problems are discussed.
机译:本文是根据联邦能源管理委员会(FERC)对美国电力研究所(ERRI)对美国主要非联邦水库进行的水库泥沙调查数据进行分析而编写的。三个主要目的。 FERC和EPRI的共同努力是:1)确定水库中沉积问题的范围和严重性; 2)探索应用现代技术减轻沉积问题的可行性; 3)确定协助FERC的技术准则的需求为水电项目中存在水库沉积问题的人员提供许可,并协助水电运营商保护宝贵的水力资源免受沉积物破坏。调查结果总结表明,有25%的水库受到沉积的负面影响。此外,讨论了水库经营者可以采取的评估沉积物问题范围和影响的步骤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号