【24h】

Rocky reach kaplan turbine replacement

机译:洛基卡普兰涡轮机更换

获取原文

摘要

The paper presents the continuing experience with a large Kaplan turbine replacement program undertaken for eleven turbine-generator units of the Rocky Reach Hydroelectric Project on the mid-Columbia River near Wenatchee, WA. The manufacturing and installation phases of the contract for Units 1-7 are addressed. The paper elaborates on the considerations which lead to the inclusion of rehabilitiation of Units 8-11 into the existing contract. Model turbine design and development for Units 8-11 are also covered. unit 8-11 prototype turbine design and manufacturing, and planning for the upcoming field activities are discussed.
机译:本文介绍了在Webatchee附近的哥伦比亚中哥伦比亚河上的十一岩会发电机单元开展的大型卡普兰涡轮更换计划的持续经验。单位1-7合同的制造和安装阶段是解决的。本文阐述了考虑因素,导致将单位8-11恢复到现有合同中。 21-11的模型涡轮设计和开发也是如此。第8-11单元原型涡轮机设计和制造,并讨论了即将到来的现场活动的规划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号