Heuristics and applications for resource-constrained project scheduling with minimal and maximal time lags

机译:具有最小和最大时间滞后的资源受限项目调度的启发式方法和应用

获取原文

摘要

Projects with minimal and maximal time lags between different activities are considered. We model such projects using cyclic activity-on-node networks. Heuristics for various types of optimization problems are discussed. The problem of finding an optimal make-to order production schedule is modelled as a resource-constrained project scheduling problem. We outline what appear to be fruitful areas of further research into certain issues in this field. We conclude that the newly developed models and solution techniques represent useful advances in project scheduling.
机译:考虑在不同活动之间具有最小和最大时间滞后的项目。我们使用循环节点活动网络对此类项目进行建模。讨论了各种优化问题的启发式方法。查找最佳按订单生产计划的问题被建模为资源受限的项目计划问题。我们概述了对该领域中某些问题进行进一步研究的似乎富有成果的领域。我们得出的结论是,新开发的模型和解决方案技术代表了项目计划方面的有益进步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号