首页> 外文会议>Electrical Insulation and Dielectric Phenomena, 1997. IEEE 1997 Annual Report., Conference on >A study on the oscillating wave voltage test as an after-laying test for distribution power cables
【24h】

A study on the oscillating wave voltage test as an after-laying test for distribution power cables

机译:振荡波电压测试作为配电电缆敷设后测试的研究

获取原文

摘要

In this study, experimental investigation has been carried out for the defect detecting capability of two different way of the OW (oscillating wave) voltage test, such as with-cable-charging and without-cable-charging method. For this purpose, two types of OW voltage tests have been performed at the laboratory on the 22.9 kV CN/CV cables in which artificial needle-type and knifecut-type defects were well integrated. Based on the test results, it could be remarked that the with-cable-charging method is more appropriate to the after laying test due to its consistency of the test condition regardless of the cable length under testing.
机译:在这项研究中,已经进行了实验研究以检测两种不同方式的OW(振荡波)电压测试的缺陷检测能力,例如带电缆充电和不带电缆充电的方法。为此,在实验室对22.9 kV CN / CV电缆进行了两种类型的OW电压测试,在这些电缆中,人工针型和刀切型缺陷已得到很好的整合。根据测试结果,可以注意到,无论测试电缆的长度如何,带电缆充电方法由于其在测试条件下的一致性而更适合于敷设后的测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号