首页> 外文会议>Emerging Technologies and Factory Automation, 1996. EFTA '96. Proceedings., 1996 IEEE Conference on >A simulation approach for improving the strategic planning of overhaul industries
【24h】

A simulation approach for improving the strategic planning of overhaul industries

机译:一种改进大修行业战略规划的模拟方法

获取原文

摘要

Strategic planning in a multi-project environment aims at evaluating the needs in resources and materials for an intermediate period of time. That task is particularly difficult when the projects involved are overhauls. The content of repair and modification work varies from equipment to equipment and depends directly on the condition of the one being overhauled. This paper describes a simulation approach for the evaluation of the resource requirements of many concurrent overhaul projects over a long period of time. The model was used to evaluate real overhaul project schedules in the aerospace industry. A comparison between durations obtained from simulation and real overhaul project durations was performed. These results indicate that simulation is a better approach than standard project planning techniques when evaluating the time required to complete an overhaul.
机译:多项目环境中的战略规划旨在评估中间时间段内对资源和材料的需求。当所涉及的项目进行大修时,该任务特别困难。维修和改装工作的内容因设备而异,并且直接取决于被检修设备的状况。本文介绍了一种模拟方法,用于评估很长一段时间内许多同时进行的大修项目的资源需求。该模型用于评估航空航天业的实际大修项目进度。对从仿真获得的工期与实际大修项目工期进行了比较。这些结果表明,在评估完成大修所需的时间时,与标准项目计划技术相比,模拟是一种更好的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号