Experimental study on the causes of electrical breakdown of EHV XLPE insulation using 'prebreakdown partial discharge detection method'

机译:“预击穿局部放电检测法”对超高压交联聚乙烯绝缘电击穿原因的实验研究

获取原文

摘要

The causes of electrical breakdown in EHV XLPE (cross-linked polyethylene) cables were clarified by carrying out the prebreakdown partial discharge (PBPD) detection test under electric stresses from 40 to 70 kV/mm. Ten causes of electrical breakdown were observed in the PBPD test. As expected, it was found that they were associated with very small contaminants and protrusions. The electrical tree inception stress was estimated to be 270 kV/mm on the average. The prebreakdown time was estimated to be on the order of 1 hour under an applied electric field of 5 kV/mm.
机译:通过在40至70 kV / mm的电应力下进行预击穿局部放电(PBPD)检测测试,可以弄清EHV XLPE(交联聚乙烯)电缆的电击穿原因。在PBPD测试中观察到了十种导致电击穿的原因。如预期的那样,发现它们与非常小的污染物和突起有关。电树起始应力平均估计为270 kV / mm。在5kV / mm的施加电场下,预击穿时间估计为约1小时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号