DESIGN, CONSTRUCTION, AND PROCUREMENT CONSIDERATIONS FOR TUNNELING SEGMENTS OF MTA BALTIMORE RED LINE

机译:MTA巴尔的摩红线隧道段的设计,构造和采购注意事项

获取原文

摘要

The Maryland Transit Administration (MTA) Baltimore Red Line Light Rail Transit(LRT) Project, a proposed 14.1-mile twin-track east-west transit link across DowntownBaltimore between the Federal campus at the Center for Medicare and MedicaidServices and the Bayview Medical Center campus of Johns Hopkins University, featurestwo tunnel sections totaling about four miles. During preliminary engineering, theProgram Management Consultant (PMC) and General Engineering Consultant (GEC)teams explored alternative contracting methods including Design/Build (DB), Design/Bid/Build (DBB) (baseline), Design/Build/Operate/Maintain, and Design/Build/Finance/Operate/Maintain under several financing models including Public-Private Partnerships(P3) to deliver the Project. Challenges and risks presented and evaluated included contractpackaging interfaces, difficult ground conditions (residual and transition soils tomixed-face and hard rock), overlying urban development including sensitive structures,site constraints, and mining techniques.
机译:马里兰州运输管理局(MTA)巴尔的摩红线轻轨交通 (LRT)项目,拟议横跨市区的14.1英里双轨东西向运输线路 巴尔的摩,位于联邦医疗保险中心和医疗补助中心之间 服务和约翰·霍普金斯大学的湾景医疗中心校区,特色 两个隧道段,总计约四英里。在初步工程期间, 计划管理顾问(PMC)和总工程顾问(GEC) 团队探索了其他签约方式,包括设计/建造(DB),设计/ 出价/构建(DBB)(基准),设计/构建/运营/维护以及设计/构建/财务/ 在包括公私合营伙伴关系在内的几种融资模式下运营/维护 (P3)交付项目。提出和评估的挑战和风险包括合同 包装界面,困难的地面条件(残留和过渡土壤 混合面和硬石),覆盖城市发展,包括敏感结构, 场地限制和采矿技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号