GROUND INVESTIGATION CHALLENGES AT THE PORT OF MIAMI TUNNEL PROJECT, MIAMI, FLORIDA

机译:佛罗里达州迈阿密市迈阿密隧道项目的地面调查挑战

获取原文

摘要

The Port of Miami Tunnel will connect PortMiami directly to the surrounding highways,alleviating traffic congestion. The project comprises two 11.3-m-internal-diameter,1.27-km-long tunnels bored under the main shipping channel in Biscayne Bay. Theseare the first large-diameter tunnels constructed through Florida’s challenging carbonategeology, and because of the heterogeneous ground conditions, the baseline investigationleft many geotechnical uncertainties. To reduce these uncertainties, a phasedcomplementary ground investigation was performed, adopting numerous techniques,the integrated interpretation of which allowed development of a realistic ground model.The ground investigation, which proved to be one of Florida’s most comprehensive,had a major impact on the tunneling methods that were adopted.
机译:迈阿密隧道(Port of Miami)隧道将直接将迈阿密港口(PortMiami)连接到周围的高速公路, 缓解交通拥堵。该项目包括两个11.3米内径, 比斯坎湾的主要航运通道下钻了1.27公里长的隧道。这些 是佛罗里达州具有挑战性的碳酸盐建造的第一条大直径隧道 地质,并且由于地面条件不均匀,需要进行基线调查 留下了许多岩土工程方面的不确定性。为了减少这些不确定性,分阶段进行 进行了补充地面调查,采用了多种技术, 对其的综合解释允许开发现实的地面模型。 地面调查被证明是佛罗里达州最全面的调查之一, 对采用的隧道方法产生了重大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号