首页> 外文会议>Chinese Control and Decision Conference >Study and Application of Project Acceleration Measures Based on ACA
【24h】

Study and Application of Project Acceleration Measures Based on ACA

机译:基于ACA的项目加速措施的研究与应用

获取原文

摘要

In order to control the project schedule delay problem efficiently in actual construction,the mathematical model of Multi-process Cross-operating Acceleration Measures is built based on improvement of process implementation mode function expression and analysis of process duration-cost relationship after considering the logical and resource constraints.Then the feasible project schedule of some engineering example can be achieved by solving the mathematical model with ant colony algorithm which contains elite strategy.The final results prove that it could provide rational references for actual acceleration construction by comparing with enumeration algorithm.
机译:为了在实际施工中有效地控制工程进度延期问题,在考虑逻辑和逻辑的基础上,通过改进过程实现方式函数表达并分析过程工期-成本关系,建立了多过程交叉操作加速措施数学模型。通过采用包含精英策略的蚁群算法求解数学模型,可以得到一些工程实例的可行工程进度表。最后的结果证明,通过与枚举算法的比较,可以为实际的加速施工提供合理的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号