首页> 外文会议>AAS/AIAA space flight mechanics meeting >NAVIGATION OF NASA'S VAN ALLEN PROBES MISSION
【24h】

NAVIGATION OF NASA'S VAN ALLEN PROBES MISSION

机译:NASA的所有概率任务导航

获取原文

摘要

The Van Allen Probes Mission, part of NASA's Living With a Star Program,successfully launched on August 30th, 2012 from the Cape Canaveral Atlas-VSpace Launch Complex 41. The two-year mission was designed, built, and operatedby the Johns Hopkins University Applied Physics Laboratory. It consistsof two spin-stabilized spacecraft, in nearly identical highly-eccentric Earth orbits,which contain instruments to study ions, electrons, and the local magneticand electric fields of Earth's inner and outer radiation belts. The two spacecraftwere launched on a single Atlas V 401 launch vehicle, and placed in orbits thatcause one spacecraft to lap the other approximately four times per year. Thispaper describes the ground assets, navigation data, Orbit Determination (OD)software of the navigation process, the prelaunch analysis that characterizedexpected OD performance, and results of actual early OD performance. Detailsare also provided on spacecraft initial acquisition contingencies given combinationsof off-line ground stations and their effect on the launch go / no-go criteria.
机译:范·艾伦(Van Allen)探测任务是美国国家航空航天局(NASA)的“与星共存”计划的一部分, 成功于2012年8月30日从卡纳维拉尔角地图集-V发射升空 太空发射综合体41.为期两年的任务是设计,建造和运行的 由约翰霍普金斯大学应用物理实验室提供。它包含 在几乎相同的高度偏心地球轨道上的两架自旋稳定航天器中, 其中包含研究离子,电子和局部磁场的仪器 以及地球内部和外部辐射带的电场。两个航天器 在一架Atlas V 401运载火箭上进行了发射,并被放置在 导致一架飞船每年大约重叠四次。这 论文描述了地面资产,导航数据,轨道确定(OD) 导航过程的软件,其特点是启动前的分析 预期的OD性能以及实际早期OD性能的结果。细节 在给定组合的情况下,还提供了航天器初始获取意外事件的信息 离线地面站的位置及其对启动/不通过标准的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号