Keys to Success in Managing a Complicated Tunnel Project: City of Columbus—Big Walnut Sanitary Trunk Sewer Extension

机译:成功管理复杂隧道项目的关键:哥伦布市-大胡桃木卫生污水干渠扩建

获取原文

摘要

The Big Walnut Sanitary Trunk Sewer Extension project, completed in the fall of 2009, offersmany lessons learned in terms of a cost-effective approach to managing a tunnel project. Key lessons relateto the use of new technology, claims avoidance and communication with area residents, including 24/7responsiveness. The project consisted of the installation of 9,900 lineal feet of 72-inch sanitary sewer, installationof five access shaft/manhole structures, installation of a tangential inlet drop structure and associated deaerationchamber/appurtenances, as well as the installation of 36-inch sanitary sewer and manholes. The constructionmanagement team encountered many challenges that could have resulted in potential claims situations.
机译:大胡桃木卫生污水干渠扩建项目于2009年秋季完成,提供了 在管理隧道项目中采用了经济有效的方法,因此吸取了很多教训。关键课程相关 使用新技术,避免和与当地居民沟通,包括24/7 响应能力。该项目包括安装9,900直英尺的72英寸下水道,安装 五个检修井/井孔结构的安装,切向进气口降落结构的安装以及相关的除气 室/配件,以及安装36英寸的下水道和检修孔。那个工程 管理团队遇到了许多可能导致潜在索赔情况的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号