首页> 外文会议>IEEE PES Asia-Pacific Power and Energy Engineering Conference >Research on the Analysis Method of the Relationship between Alarm Signal Action and Sequential Logic in Smart Substation
【24h】

Research on the Analysis Method of the Relationship between Alarm Signal Action and Sequential Logic in Smart Substation

机译:智能变电站报警信号动作与顺序逻辑关系的分析方法研究

获取原文

摘要

With the large-scale deployment of IED, the number of alarm signal increase dramatically, causing some problems such as invalid alarm and secondary alarm frequency, malfunctions of protective relays and circuit breakers and so on. Due to the lack of effective preprocessing of monitoring data, it is difficult for the operator to make the right judgment in a short time. To solve the above problems, this paper put forward an analysis method of the relationship between alarm signal action and sequential logic in smart substation. On the basis of IEC61850 standardized modeling and the filtering and classification of monitoring information, the configuration file and network topology analysis of substation system are analyzed, obtaining the relationship between the power element and the protection and circuit breaker, and a backtracking method based on time constraint and action logic is constructed by introducing the timing constraint of alarm information into the event chain. Finally, proved by an example, the method is correct and feasible.
机译:随着IED的大规模部署,报警信号的数量急剧增加,导致一些问题,例如无效的报警和次要报警频率,防护继电器和断路器的故障等。由于缺乏有效的监测数据预处理,运营商难以在短时间内进行正确的判断。为解决上述问题,本文提出了一种分析方法,智能变电站报警信号动作与顺序逻辑之间的关系。在IEC61850标准化建模和监测信息的过滤和分类的基础上,分析了变电站系统的配置文件和网络拓扑分析,获得了功率元件与保护和断路器之间的关系,以及基于时间的回溯方法通过将警报信息的定时约束引入事件链来构建约束和动作逻辑。最后,通过一个例子证明,该方法是正确的和可行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号