首页> 外文会议>IEEE International Conference on Intelligent Transportation Engineering >Risk Evaluation of Railway Business Line Construction Plan Based on Analytic Hierarchy Process and Bayesian Network
【24h】

Risk Evaluation of Railway Business Line Construction Plan Based on Analytic Hierarchy Process and Bayesian Network

机译:基于层次分析和贝叶斯网络的铁路业务线建设计划风险评估

获取原文

摘要

In order to improve the construction level of highspeed railway business lines, ensure the quality status of highspeed rail facilities, reduce the risk of business line construction, rational evaluating the business line construction plan risk is an urgent research. This paper combines Analytic Hierarchy Process (AHP) with Bayesian network(BN) and adapts AHP to determine the weight of each indicator; Based on BN theory, constructs a probabilistic model of business line construction risk evaluation and calculates the probability of different risk factors as low, medium and high risk. Finally takes the Beijing Railway Bureau's business line as an example to conduct a comprehensive evaluation, and concludes that the overall risk factor of the project is at a medium risk level, and the evaluation results are in good agreement with the actual site, therefore indicating that this evaluation method is more comprehensive exhaustive than the existing evaluation methods, it has certain practical significance for the railway site construction plan.)
机译:为了提高高速铁路业务线的建设水平,确保高速铁路设施的质量现状,降低商业线路建设风险,理性评价业务线建设规划风险是一个紧急的研究。本文将分析层次处理(AHP)与贝叶斯网络(BN)结合起来,适应AHP确定每个指标的重量;基于BN理论,构建商业线路建设风险评估的概率模型,并计算不同风险因素的概率,低,中等风险。终于将北京铁路局的业务线为例进行了综合评价,并得出结论,该项目的总体风险因素处于中等风险水平,评估结果与实际网站吻合良好,因此表明这一点该评估方法比现有的评价方法更全面地彻底,它对铁路现场建设计划具有一定的实际意义。)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号