首页> 外文会议>IEEE International Energy Conference >Scaling Milton Keynes power requirements for electrical transportation
【24h】

Scaling Milton Keynes power requirements for electrical transportation

机译:缩放米尔顿凯恩斯电力运输的电源要求

获取原文

摘要

Milton Keynes is home to the UK's first installation of a wirelessly charged passenger bus route. This Inductive Power Transfer (IPT) system enables a fleet of 8 electric buses to service a demanding 15-mile urban route. Opportunistic wireless charging of the batteries during the layover time at the routes allows reducing the size of the batteries, consequently improving cost and performance characteristics of the bus. This paper aims to analyze the effects of electric buses on the electricity distribution grid. In particular, the paper analyses scalability of the IPT solution to all urban routes in Milton Keynes and compares peak power requirements generated at different points in the network with typical industrial and commercial (I&C) loads.
机译:米尔顿凯恩斯是英国首次安装无线带电的客车路线的所在地。这种电感电力传输(IPT)系统使8段的电动公交车能够为苛刻的15英里城市路线提供服务。在路线上的Layover时间内电池的机会无线充电允许降低电池的大小,从而提高了总线的成本和性能特性。本文旨在分析电动公共汽车对电力分布网格的影响。特别是,本文分析了IPT解决方案对米尔顿凯恩斯的所有城市路线的可扩展性,并比较了网络中不同点生成的峰值功率要求,具有典型的工业和商业(I&C)负载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号