首页> 外文会议>International Congress and Exposition on Noise Control Engineering >Noise and vibration evaluation of the Budapest metro train's monoblock and duoblock wheels
【24h】

Noise and vibration evaluation of the Budapest metro train's monoblock and duoblock wheels

机译:布达佩斯地铁列车的单块和双块车轮的噪声和振动评估

获取原文

摘要

The renewal of the subway cars of line M3 has started in 2016 and the first new Russian trains were in operation since January 2017. Older - almost 40 years old -trains were still on the track with duoblock wheels which were replaced by monoblocks during the renewal. In 2010, the old trains of line M2 were replaced by modern Alstom subway cars with monoblock wheels due to the increased noise and vibration problems. Population complains also increased regarding line M3. Meanwhile, line M3 has also declined dramatically and began to be reconstructed intermittently from 2017. We performed noise and vibration measurements in several residential houses and in a hospital building before and after the renewal of the trains. According to the results of the measurements, the noise and vibration emission of the renovated trains are higher than the old ones. Therefore, regulation limits were defined before the reconstruction in order to meet the limit values laid down by law. Reconstruction of the track will completely replace the rails and new, softer rail pads will be installed at different sections due to vibration protection. After the reconsruction monitoring noise and vibration measurements will be carried out to assess the adequacy of vibration protection. The difference between monoblock and duoblock wheels and the resulting noise and vibration emission values will be shown in the presentation. Moreover, the estimations based on measurements and the different types of wheels and their expected noise and vibration levels after the reconstructed track in the protected buildings are also will be presented.
机译:M3号线的地铁车厢的更新已于2016年开始,并且第一批新的俄罗斯火车自2017年1月起投入运营。已有近40年历史的旧火车仍在使用duoblock车轮在轨道上,在更新期间,这些车轮被单体车取代了。 。 2010年,由于增加的噪音和振动问题,M2号线的旧火车被带整体式轮毂的现代阿尔斯通地铁车厢所取代。关于M3线的居民抱怨也有所增加。同时,M3号线也急剧下降,并从2017年开始进行间歇性的重建。在火车更新前后,我们在几栋住宅和医院大楼中进行了噪声和振动测量。根据测量结果,经过翻新的火车的噪音和振动排放都高于旧火车。因此,为了满足法律规定的极限值,在重建之前就定义了极限值。轨道的重建将完全取代轨道,并且由于具有振动保护功能,新的,较软的轨道垫将安装在不同的区域。在重建之后,将进行噪声和振动测量,以评估振动防护的适当性。单块和双块车轮之间的差异以及由此产生的噪声和振动发射值将在演示中显示。此外,还将介绍基于测量和车轮的不同类型的估计以及在受保护的建筑物中重建轨道之后它们的预期噪声和振动水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号