首页> 外文会议>International Congress and Exposition on Noise Control Engineering >Research activities on INCE/J RTV (Road Traffic Vibration)-Model - Part: 2 Prediction of ground-borne vibration induced by traffic from cutting- and banking-structure roads
【24h】

Research activities on INCE/J RTV (Road Traffic Vibration)-Model - Part: 2 Prediction of ground-borne vibration induced by traffic from cutting- and banking-structure roads

机译:ICE / J RTV(道路交通振动)-MODEL的研究活动 - 部分:2由剪切和银行结构道路诱导地面振动的预测

获取原文
获取外文期刊封面目录资料

摘要

In INCE/J, the prediction method of the first version of INCE/J RTV-Model named INCE/J RTV-Model 2003 for environmental impact assessment on ground-borne vibration induced by the road traffic was published for flat roads in 2003. L_(V10) (10 percentile-exceeded frequency weighted acceleration level) is used in the vibration evaluation for an environmental assessment in Japan. For this reason, the prediction in the model was based on a method to calculate the summation in decibel considering traffic volume within the defined time from the unit pattern which is the time history of vibration acceleration level at the prediction point when one vehicle runs on the road. The unit pattern could be calculated by using a simply empirical equation for the distance attenuation by Bornitz. In order to extend the previous model to a new applicable model for both cutting- and banking-structure roads, numerical simulations were performed. These results were summarized in this paper.
机译:在Ince / J中,2003年在公路交通诱导的环境影响评估中名为INCE / J RTV模型的第一版INCE / J RTV模型的预测方法为平坦的道路发表了道路交通的平面道路。L_ (v10)(超过10百分位数的频率加权加速度水平)用于日本环境评估的振动评估。因此,模型中的预测基于在从单位模式中考虑分贝中的求和的方法,该方法从单位模式到一个车辆在预测点处的振动加速度水平的时间历史路。可以通过使用Bornitz的距离衰减的简单经验方程来计算单元图案。为了将以前的模型扩展到用于切割和银行结构道路的新适用模型,执行数值模拟。本文总结了这些结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号