Changi Water Reclamation Plant: The plant of the future constructed in the now

机译:樟宜再生水厂:现在建造的未来工厂

获取原文

摘要

PUB (the Singapore Public Utilities Board) own and operate the Changi Water Reclamation Plant (CWRP). The extension of the CWRP treats an average of 200,000 m~3/d (43 mgd) in an activated sludge membrane bioreactor (MBR) system in the domestic stream. A local contractor, HSL, engaged Mott MacDonald to complete the detailed design of the new extension. The design included 4D - 7D elements in BIM and is one of the most advanced BIM projects in the world today. The use of BIM extended beyond these 4D - 7D inputs into using virtual reality for operability and maintainability (and general design), and safety in design workshops, BIM to field applications and reality capture to monitor construction progress and complete "As Builts". This paper summarises the development of the project using the model environment, including lessons learned through this process.
机译:PUB(新加坡公用事业局)拥有并运营樟宜水回收厂(CWRP)。 CWRP的扩展在生活污水中的活性污泥膜生物反应器(MBR)系统中平均处理200,000 m〜3 / d(43 mgd)。本地承包商HSL聘请Mott MacDonald完成新扩展的详细设计。该设计在BIM中包含4D-7D元素,并且是当今世界上最先进的BIM项目之一。 BIM的使用已从这些4D-7D输入扩展到使用虚拟现实来实现可操作性和可维护性(以及一般设计),设计车间的安全性,将BIM应用于现场应用程序和现实捕获以监视施工进度并完成“竣工”。本文总结了使用模型环境进行项目的开发,包括从此过程中学到的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号