首页> 外文会议>International Conference on Computer Aided Systems Theory >Solving a Flexible Resource-Constrained Project Scheduling Problem Under Consideration of Activity Priorities
【24h】

Solving a Flexible Resource-Constrained Project Scheduling Problem Under Consideration of Activity Priorities

机译:考虑活动优先级的灵活的资源受限项目计划问题

获取原文

摘要

In the context of real-world optimization problems in the area of production and logistics, multiple objectives have to be considered very often. Precisely such a situation is also regarded in this work. For a resource-constrained project scheduling problem with activity selection and time flexibility, a new bi-objective extension is developed. Motivated by a steel industry production case, each of two already existing objective functions, makespan minimization and time balance maximization, is deployed together with a newly developed objective, the so-called activity priority maximization. To solve the resulting two bi-objective optimization problems and provide all existing trade-off solutions, the e-constraint method is used. A constraint programming model is presented and solved with the CP Optimizer of IBM ILOG CPLEX and the results are compared concerning solution quality and runtime, showing the competitiveness of the developed model.
机译:在生产和物流领域的实际优化问题中,必须经常考虑多个目标。正是在这种工作中也考虑到了这种情况。对于具有活动选择和时间灵活性的资源受限的项目计划问题,开发了一种新的双目标扩展。受钢铁行业生产案例的激励,将两个已经存在的目标功能(使跨度最小化和时间平衡最大化)中的每一个与新开发的目标(所谓的活动优先级最大化)一起部署。为了解决由此产生的两个双目标优化问题并提供所有现有的折衷解决方案,使用了电子约束方法。提出了约束编程模型,并使用IBM ILOG CPLEX的CP Optimizer对其进行了求解,并比较了有关解决方案质量和运行时的结果,显示了所开发模型的竞争力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号