STABILIZAION WORKS OF TUNNEL WITH STEEL FIBER INSTEAD OF WELDED WIRE MESH AS SHOTCRETE REINFORCEMENT, TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAB KABAO - THANON CHIRA JUNCTION CONTRACT C3 - TUNNEL WORKS, THAILAND

机译:东北线MAB KABAO-THANON CHIRA JUNCTION合同C3-隧道工程,钢筋加固的钢丝网代替钢丝网作为稳定加固的隧道工程

获取原文

摘要

Track Doubling Project for Northeastern Line Mab Kabao - Thanon Chira Junction Contract C3 - Tunnel Works is situated in Saraburi Province and Nakhon Ratchasima Province of Central and Northeastern Thailand. It comprises of three railway tunnels with a total distance of 12.5 km. It is one of the flagship track doubling projects of the State Railways of Thailand of which the contract was awarded to the Joint Venture of ITD - RT as an EPC contractor. The stabilization works of the tunnel during construction period and for its long-term use with utmost safety of the workers and the train passengers is of prior importance. One of those stabilization works is the shotcrete supporting work. The tunnels had been excavated using a drill and blast method through various kinds of rock conditions of sandstone, siltstone and shale. A typical tunnel section is designed for two single track tunnels of approx. 8×9 m (W × H), horse shoe-shaped cross section and one double track tunnel of approx. 12×9m (W × H). According to initial technical specification, the shotcrete support is required with welded wire mesh of 4mm and 150mm square reinforcement fixing to the specified tunnel crown and walls before shotcrete spraying. The compressive strength of the shotcrete at 28 days of 30 MPa is required. To date, the shotcrete spraying onto the fixed welded wire mesh had been carried out for a period of about six (6) months since beginning, using a minimum of eight (8) workers for a time consuming of about 3-4 hours for fixing the welded wire mesh of approx. 200m~2 whereas the total area of the mesh fixing is more than 200,000 m~2. Thus, the Contractor has proposed the steel fiber instead of the welded wire mesh as the shotcrete reinforcement to the Client. Its usage advantage is evidently the savings of the manhour of labor that is due to no fixing of the welded wire mesh. The ready-mixed shotcrete with steel fiber from concrete batching plant can be immediately sprayed to the tunnel surfaces. Meanwhile the initial requirement of steel fiber content of 60 kg per cubic meter of shotcrete was specified in the Technical Specification. However, the Contractor has proposed the deviating quantity of the steel fiber for the works of 25 and 30 kg per cubic meter of shotcrete. Further, the quality control of the shotcrete with steel fiber reinforcement is subject to the European standard of EN-14488-5 testing of which energy absorption of test panels shall not be less than 700 Joule.
机译:东北线Mab Kabao的轨道加倍工程-Thanon Chira交汇处C3合同-隧道工程位于泰国中部和东北部的沙拉武里府和那空叻差希马省。它由三个铁路隧道组成,总距离为12.5 km。它是泰国国家铁路的旗舰加倍铁路项目之一,该合同已作为EPC承包商被授予ITD-RT合资企业。在施工期间进行隧道的稳定工作以及长期使用隧道,以确保工人和火车乘客的最大安全至关重要。这些稳定工程之一是喷射混凝土支撑工程。隧道是通过钻孔和爆破方法在各种砂岩,粉砂岩和页岩的岩石条件下开挖的。典型的隧道断面设计用于两条单轨隧道,大约为。 8×9 m(W×H),横截面为马蹄形,一条双轨道隧道,大约12×9m(宽×高)根据最初的技术规范,在喷射混凝土喷射之前,需要用4mm和150mm方形加强筋的焊接金属丝网将喷射混凝土支撑固定在指定的隧道拱顶和墙壁上。要求喷射混凝土在28天时的抗压强度为30 MPa。迄今为止,自开始以来,喷射喷浆喷涂到固定的焊接丝网上已经进行了大约六(6)个月,至少使用八(8)名工人进行了大约3-4小时的固定修复时间。焊接金属丝网约200m〜2,而网眼固定的总面积超过200,000 m〜2。因此,承包商向客户建议使用钢纤维代替焊接丝网作为喷射混凝土加固。它的使用优势显然是由于不固定焊接金属丝网而节省了工时。可以将混凝土搅拌站的钢纤维预拌混凝土喷射到隧道表面。同时,技术规范中规定了钢纤维含量的初始要求为每立方米喷射混凝土60 kg。但是,承包商提出了每立方米喷射混凝土25公斤和30公斤工程中钢纤维的偏离量。此外,用钢纤维增强的喷射混凝土的质量控制要符合欧洲标准EN-14488-5的测试,测试板的能量吸收应不小于700焦耳。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号