Kriegers Flak Combined Grid Solution - novel double use of offshore equipment

机译:Kriegers Flak组合电网解决方案 - 小说双重设备

获取原文

摘要

The Krieger Flak Combined Grid Solution (KF CGS) will be in commercial operation from early 2019. Major novelty of the project is the combination of the existing and scheduled offshore wind power grid-connection systems with an interconnector between the two countries. Germany and Denmark. The project shall use equipment for offshore wind power transmission for the interconnector in order to utilize the remaining transmission capacity for the electricity market when it is not fully utilized by infeed from wind energy. KF CGS comprises platforms of three wind farms (Danish Kriegers Flak and German Baltic 1 & Baltic 2, totalling 966 MW production capacity), the respecting cable connections towards shore as well as a connection between the offshore platforms of Baltic 2 and Kriegers Flak wind farm and an HVDC Back-to-Back (HVDC BtB) converter on the German shore. The HVDC BtB is needed to establish asynchronous interconnection between the two synchronous areas Continental Europe (Germany) and Nordic (Denmark East).
机译:Krieger Flak联合电网解决方案(KF CGS)将于2019年初商业运营。该项目的主要新颖性是现有和预定的海上风电网连接系统与两国之间的互联网组合。德国和丹麦。该项目应使用互联网上海上风电传动设备,以利用电力市场的剩余传输能力,当不充分利用风能时不充分利用。 KF CGS包括三种风电场的平台(丹麦克里斯队Flak和德国波罗的海1和BALTIC 2,总共966 MW生产能力),尊重岸边的电缆连接以及波罗的海2和Kriegers Flak Wind Farm的海上平台之间的联系和德国岸上的HVDC背对背(HVDC BTB)转换器。 HVDC BTB需要在两个同步区域大陆欧洲(德国)和北欧(丹麦东部)之间建立异步互连。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号