首页> 外文会议>International Conference on Safety and Security Engineering >Safe remaining lifetime assessment of power plant steam boilers
【24h】

Safe remaining lifetime assessment of power plant steam boilers

机译:电厂蒸汽锅炉安全剩余的寿命评估

获取原文

摘要

Energy producing power plants are designed for an operational period of 20-30 years. During this period, inspections are realized to investigate the operational capability of the respective components and the plant as a whole, and when the designed time is approaching its limit, crucial questions are raised with respect to the continuing possible operation, and its safety and risks that stem from the fact that the continuous degradation of material property has occurred during the lifetime of service as a result of service conditions, e.g. high temperatures, fatigue loading etc. The inspection of the boiler and the assessment of its future operational capability should ensure the safe operation and minimization of the failure risks that can cause not only economic losses. This paper summarizes the results of non-destructive (NDT) and destructive mechanical and metallographic tests performed in order that the degradation of material property of the decisive Steam Turbine Boiler Components due to service conditions could be evaluated and the resulting residual lifetime assessed. On the basis of performed examination, the results provided the customer with recommendations relating to the future safe and reliable operation of the boiler.
机译:能源生产电厂设计用于20 - 30年的运营期。在此期间,实现检查以研究各个组分和整个工厂的操作能力,并且当设计的时间接近其极限时,就持续可能的运作提出了重要问题,以及其安全性和风险这源于由于服务条件而在服务的寿命期间发生了材料性能的连续降解,例如高温,疲劳载荷等。锅炉的检查和对其未来的运营能力的评估应确保安全运行和最小化失败风险,可能不仅会导致经济损失。本文总结了所执行的非破坏性(NDT)和破坏性机械测试的结果,以便可以评估由于服务条件引起的决定性汽轮机锅炉组分的材料性能的降解,并得到了所得的残留寿命。在执行审查的基础上,结果为客户提供了与锅炉未来安全可靠运行有关的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号