首页> 外文会议>IEEE Conference on Energy Internet and Energy System Integration >Comparison of Strategies for Operational Flexibility Enhancement of Combined Heat and Power Plants
【24h】

Comparison of Strategies for Operational Flexibility Enhancement of Combined Heat and Power Plants

机译:热电厂联合运营灵活性提高策略的比较

获取原文

摘要

This paper compares the strategies for improving the operational flexibility of combined heat and power (CHP) plants to support wind power integration. Four commonly used strategies, namely cutting off low pressure cylinder, installing heat accumulator, installing electric boiler, and utilizing by-pass device are discussed. An integrated model is proposed to quantify the performance of various strategies in improving the flexibility of CHP plants. A 350 MW subcritical extraction condensing turbine in China is used as an example, to compare the performance of the four strategies from the viewpoint of the operating cost of flexibility enhancement. The maximum flexibility and the scope of applicability can be enhanced.
机译:本文比较了提高热电联产(CHP)电厂运行灵活性以支持风电集成的策略。讨论了四种常用的策略,即切断低压缸,安装蓄热器,安装电锅炉和利用旁路装置。提出了一个集成模型来量化提高CHP工厂灵活性的各种策略的性能。以中国一台350 MW亚临界抽汽凝汽轮机为例,从提高灵活性的运行成本角度比较了这四种策略的性能。最大的灵活性和适用范围可以得到增强。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号