The Fort Worth Central City (Panther Island) project is a major urban revitalization project located near downtown Fort Worth, Texas. The project began in 2002 as part of a master plan for the area that included flood control protection and assessed an area that encompassed 88 miles of the Trinity River and its major tributaries. As part of the project, a multi-phase effort is being undertaken to protect water quality in the Trinity River. The project effort includes several key elements to identify mitigation strategies based on science. The first element is a water quality model to assess the impact of development on water quality and green stormwater infrastructure (GSI) facilities and other best management practices (BMPs) to protect water quality. The second element is development of water quality requirements and implementation guidance. The third is a conceptual plan to evaluate opportunities to implement GSI. The project evaluated a wide range of green infrastructure options for developers to implement select strategies that provide resilient stormwater infrastructure while meeting project needs and goals. The impact of GSI / BMPs was evaluated using a coupled watershed and in-stream modeling framework to evaluate receiving water quality for critical water quality constituents (TSS, nutrients, bacteria and floatables) for potential to meet water quality goals for the Trinity River. The water quality modeling effort was intended to assess sources and pollutant loads and evaluate the impact of the BMPs to protect and maintain water quality in the Trinity River and Panther Island so the public can enjoy a high quality urban water resource. A watershed and an in-stream model were developed to evaluate the benefit of the GI implementation in the watershed upstream of and within Panther Island. The key parameters assessed by the models were nutrients, dissolved oxygen, chlorophyll, sediment and indicator bacteria. Pollutant generation rates and generalized land use category were compiled from local studies and supplemented where necessary based on accepted national references. Results from the watershed modeling show increases in loadings where development is expected to occur, including Panther Island. The proposed Central City / Panther Island plan was examined to identify potential locations for green stormwater infrastructure installation, including bioretention and permeable pavers. Development requirements were assessed to implement the required GSI / BMP efforts to protect water quality. An implementation guidance effort was undertaken to establish the necessary water quality features, level of treatment, and GSI effectiveness. The implementation guidance is intended to provide flexibility for developers, in addition to providing the required specificity and consistency that is needed for regulators. The guidance manual provides flexibility by using a component approach. The guidance manual provides detailed BMP design details and specifications for BMP component alternatives within the required categories. The handbook allows the developer to choose the type of component in each category and for their specific BMP to meet their site conditions. The project evaluated a wide range of green infrastructure options to select strategies that meet project needs and goals. GSI implementation scenarios were evaluated and the proposed Panther Island grading plan was examined to identify potential locations for green stormwater infrastructure installation. Water quality benefits associated with each of the green stormwater infrastructure practices were based on data available from the International Stormwater BMP database and modeled to evaluate the impact on the Trinity River at Panther Island. The project includes the development of a BMP / GI developer guidance manual handbook that is based on a scientific assessment, water quality modeling, and conceptual BMP layout. The manual provides detailed guidance and, also flexibility for developers. The project evaluated a wide range of BMP / GI options for developers to implement select strategies that provide resilient stormwater infrastructure while meeting project needs and goals.
机译:沃思堡中心城市(豹岛)项目是德克萨斯州沃思堡市中心附近的一项重大城市振兴项目。该项目于2002年开始,是该地区总体计划的一部分,该地区包括防洪保护,并评估了涵盖三位一体河及其主要支流88英里的地区。作为该项目的一部分,正在分三步进行,以保护三位一体河的水质。该项目的工作包括确定基于科学的缓解策略的几个关键要素。第一个要素是水质模型,用于评估开发对水质和绿色雨水基础设施(GSI)设施以及其他保护水质的最佳管理实践(BMP)的影响。第二个要素是制定水质要求和实施指南。第三个是评估实施GSI机会的概念性计划。该项目评估了广泛的绿色基础设施选项,供开发人员实施可在满足项目需求和目标的同时提供弹性雨水基础设施的精选策略。 GSI / BMPs的影响使用分水岭和河流模拟耦合框架进行评估,以评估关键水质成分(TSS,养分,细菌和漂浮物)的接收水质,以实现三位一体河水质目标的潜力。水质建模工作旨在评估源头和污染物负荷,并评估BMP对保护和维护三位一体河和黑豹岛水质的影响,从而使公众可以享受优质的城市水资源。开发了分水岭和河流模型,以评估在Panther Island上游和内部的分水岭实施GI的好处。该模型评估的关键参数是养分,溶解氧,叶绿素,沉积物和指示细菌。污染物产生率和广义土地利用类别是从地方研究中汇编的,并在必要时根据公认的国家参考进行补充。分水岭模型的结果表明,预计将发生开发的负载(包括Panther Island)的负载有所增加。对拟议的中央城市/豹岛计划进行了审查,以确定绿色雨水基础设施安装的潜在位置,包括生物滞留和可渗透的摊铺机。评估了开发要求,以实施所需的GSI / BMP努力来保护水质。实施了实施指南,以建立必要的水质特征,处理水平和GSI有效性。实施指南旨在为开发人员提供灵活性,此外还提供监管机构所需的特定性和一致性。该指导手册通过使用组件方法提供了灵活性。指导手册在所需类别内提供了BMP设计的详细细节和BMP组件替代产品的规格。该手册允许开发人员在每个类别中选择组件的类型,并选择特定的BMP来满足其现场条件。该项目评估了各种绿色基础设施选项,以选择满足项目需求和目标的策略。对GSI实施方案进行了评估,并对拟议的Panther Island分级计划进行了审查,以确定绿色雨水基础设施安装的潜在位置。与每条绿色雨水基础设施实践相关的水质收益均基于国际雨水BMP数据库提供的数据,并进行了建模以评估其对黑豹岛三一河的影响。该项目包括根据科学评估,水质建模和概念性BMP布局开发BMP / GI开发人员指导手册。该手册提供了详细的指导,也为开发人员提供了灵活性。该项目评估了广泛的BMP / GI选项,供开发人员实施选择的策略,这些策略可提供弹性的雨水基础设施,同时满足项目的需求和目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号