首页> 外文会议>International Conference on Electrical Materials and Power Equipment >Study of overvoltage and insulation coordination of UHV DC transmission line
【24h】

Study of overvoltage and insulation coordination of UHV DC transmission line

机译:UHV直流输电线过电压和绝缘协调研究

获取原文
获取外文期刊封面目录资料

摘要

In order to determine the insulation level of DC transmission line, one UHV DC transmission project is taken as an example in this paper. PSCAD program is used to establish the simulation calculation model. Multiple fault points on the fault line are selected. The induced overvoltage amplitude, distribution along the line and the maximum overvoltage envelope of healthy pole transmission line corresponding to the failure point are calculated to determine 2% statistical overvoltage. The influence of DC filter parameters, grounding resistance and grounding position on overvoltage are analyzed. According to the DC filter scheme, the DC line insulation coordination is analyzed, and the air gap of transmission line tower is determined. The calculation results provide the references for the designation and construction of UHV DC transmission projects.
机译:为了确定DC传输线的绝缘水平,将一个UHV DC传输项目作为本文的示例。 PSCAD程序用于建立仿真计算模型。选择故障行上的多个故障点。诱导的过电压幅度,沿线的分布和对应于故障点的健康极传输线的最大过电压包络数,以确定2 %统计过电压。分析了直流滤波器参数,接地电阻和接地位置对过电压的影响。根据DC滤波器方案,分析了DC线绝缘协调,并确定传输线塔的气隙。计算结果为UHV直流传输项目的指定和构建提供了参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号