Study of overvoltage and insulation coordination of UHV DC transmission line

机译:特高压直流输电线路的过电压和绝缘配合研究

获取原文
获取原文并翻译 | 示例

摘要

In order to determine the insulation level of DC transmission line, one UHV DC transmission project is taken as an example in this paper. PSCAD program is used to establish the simulation calculation model. Multiple fault points on the fault line are selected. The induced overvoltage amplitude, distribution along the line and the maximum overvoltage envelope of healthy pole transmission line corresponding to the failure point are calculated to determine 2% statistical overvoltage. The influence of DC filter parameters, grounding resistance and grounding position on overvoltage are analyzed. According to the DC filter scheme, the DC line insulation coordination is analyzed, and the air gap of transmission line tower is determined. The calculation results provide the references for the designation and construction of UHV DC transmission projects.
机译:为了确定直流输电线路的绝缘等级,本文以一个特高压直流输电工程为例。 PSCAD程序用于建立仿真计算模型。在故障线上选择了多个故障点。计算感应的过电压幅度,沿线路的分布以及与故障点相对应的健康极传输线的最大过电压包络,以确定2%统计过电压。分析了直流滤波器参数,接地电阻和接地位置对过电压的影响。根据直流滤波方案,分析了直流线路的绝缘配合,确定了输电线路塔的气隙。计算结果为特高压直流输电工程的设计和施工提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号