首页> 外文会议>AACE International conference expo >The Why, When, and How of a Productivity Claim
【24h】

The Why, When, and How of a Productivity Claim

机译:为何要求,何时以及如何提出生产率要求

获取原文

摘要

One of the most contested and controversial issues that often arises in construction claims is the calculation and/or estimation of lost productivity on a construction project. Contractors prefer to use estimation methods while owners often insist on using actual cost data, which in many cases does not exist. Tracking efficiencies and productivity on any project is often overlooked, but it can greatly affect the value of a loss of productivity claim if done correctly or incorrectly when pursuing a change orders or claims. This article will present the common pitfalls of typical loss of productivity claims based on measured mile analyses and industry studies, as well as, lessons learned and observations from actual construction claims. The article will also examine the pitfalls, why they occur, and how to avoid them in preparing a claim.
机译:在建筑索赔中经常出现的最有争议和争议的问题之一是建筑项目生产率的计算和/或估计。承包商更喜欢使用估算方法,而业主经常坚持使用实际成本数据,而在许多情况下这种数据是不存在的。在任何项目上跟踪效率和生产率通常都被忽略,但是如果在寻求变更单或索赔时做得正确或不正确,它会极大地影响生产率损失索赔的价值。本文将根据测得的英里数分析和行业研究,以及从实际施工索赔中获得的经验教训和观察结果,介绍典型的生产率损失索赔的常见陷阱。本文还将研究陷阱,为什么会出现以及如何在准备索赔时避免它们。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号