首页> 外文会议>Latin American Computer Conference >A Clustering Search Metaheuristic for the Bi-objective Flexible Job Shop Scheduling Problem
【24h】

A Clustering Search Metaheuristic for the Bi-objective Flexible Job Shop Scheduling Problem

机译:用于双目标灵活作业商店调度问题的聚类搜索成果展

获取原文

摘要

The Flexible Job Shop Scheduling Problem (FJSP) is an extension of Job Shop Scheduling (JSP), which is closer to reality, allowing an operation of a given job to be processed by alternative machines. Considering that for some industries it is relevant to consider for more than one objective, the FJSP is treated in this study in a multiobjective way whit the following criteria: the last processing time of the last operation, called makespan, and the total tardiness. Therefore, it is proposed an algorithm based on the Clustering Search (CS) metaheuristic to generate solutions, and thus produce a set of non-dominated solutions in order to obtain the Pareto frontier, providing to decision maker a set of quality solutions. To evaluate the CS, we proposed a set of instances considering due dates for the jobs, to enable analysis of the bi-objective FJSP (BOFJSP). The CS results were competitive when compared to the literature, generating several non-dominated solutions.
机译:灵活的作业商店调度问题(FJSP)是作业商店调度(JSP)的扩展,它更接近现实,允许通过备用机器处理给定作业的操作。考虑到有关某些行业与考虑有一个以上的目标,FJSP以多目标方式在本研究中处理了以下标准:最后一次操作的最后处理时间,称为MakEspan,以及总迟到。因此,提出了一种基于聚类搜索(CS)成群化的算法来生成解决方案,从而产生一组非主导的解决方案,以便获得帕累托前沿,为决策者提供一组质量解决方案。为了评估CS,我们提出了一组考虑工作日期的一组实例,以实现对双目标FJSP(BOFJSP)的分析。与文献相比,CS结果具有竞争力,产生若干非主导的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号