首页> 外文会议>IABSE symposium on tomorrow's megastructures >Recent Structures and Bridges built with the CL Steel-concrete Connection
【24h】

Recent Structures and Bridges built with the CL Steel-concrete Connection

机译:CL钢混凝土连接结构的最新结构和桥梁

获取原文
获取外文期刊封面目录资料

摘要

The design principle of the CL connection between steel and concrete is well established in Europe. The CL shape composite dowel between steel and concrete was used to realize economic and esthetic solutions for flyover bridges crossing motorways under traffic without intermediate piers with for example the precast composite beams (Preco-Beam or VFT) construction method. The reconstruction of the bridge of Elblag in Poland enhances the construction method. The cutting line of the rolled section implements a varying height of the steel web for the midfield and near the support. The details of the Elblag viaduct are presented. Also economic aspects is discussed. The viaduct over the river Elster next to Osendorf is the first bridge project using the CL connection and the Preco-Beam construction method in Germany (VFT) with a hot-dip galvanized steel structure. The external reinforcement made out of halved rolled sections contains only a small ratio of residual stresses. The steel girders are easy to handle with a length up to 16 m. The Osendorf bridge demonstrates the economic feasibility of the hot-dip galvanizing due to quality, costs, maintenance. Two bridges carrying acoustic walls along the motorway in Marseille were in France the first projects realized with the CL connection. Each structure has to carry a 6,50m high wall that has to cross a 22 meter span near the existing motorway bridge but without any support on him. The location of these structures is exposed to important wind solicitations. The fatigue due to the wind turbulences was considered to design these bridges. The use of the CL connection could simplify the anchorage of the wind forces on the concrete support, in comparison with more conventional solutions.
机译:钢与混凝土之间的CL连接的设计原理在欧洲已经确立。使用钢和混凝土之间的CL形复合材料定位销,通过预制复合梁(Preco-Beam或VFT)施工方法,实现了在无中间墩的情况下穿越交通高速公路的立交桥的经济和美观解决方案。波兰Elblag大桥的重建增强了施工方法。轧制部分的切割线为中场和支撑附近实现了变化的钢网高度。给出了Elblag高架桥的详细信息。还讨论了经济方面。位于Osendorf旁的Elster河上的高架桥是第一个使用CL连接和德国Preco-Beam建筑方法(VFT)的桥梁项目,具有热浸镀锌钢结构。由对半轧制部分制成的外部钢筋仅包含一小部分残余应力。钢制大梁易于操作,最长可达16 m。 Osendorf桥因质量,成本,维护而论证了热浸镀锌的经济可行性。在法国马赛,沿马赛高速公路上的两座带有隔音墙的桥梁是第一个通过CL连接实现的项目。每个结构都必须承载6,50m高的墙,该墙必须跨越现有高速公路桥梁附近的22米跨度,但没有支撑。这些结构的位置受到重要的风吹捧。设计这些桥时考虑了由于风湍流引起的疲劳。与更常规的解决方案相比,CL连接的使用可以简化风力在混凝土支架上的锚固。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号