Construction of a megatall tower foundation was suspended in October 2016 over concerns related to concrete uniformity and the presence of surface water during construction operations. The foundation design consisted of a four meter thick reinforced concrete transfer mat set on a network of 136 drilled concrete piers. The authors were retained as third party advisors to independently assess the as-built conditions and assist the contractor and designer in the formulation of a repair plan. The investigation commenced in December 2016 and included documentation of cores extracted from the transfer mat as well as the development of procedures to effectively ascertain conditions within the core holes. Of particular concern to the construction team was the development of a sufficiently representative sampling plan, the relative shear strength and performance of concrete joints, and the evaluation of corrosion potential within the transfer mat. A plan to repair affected locations of the transfer mat was developed to address the nature and type of conditions identified during the investigation. The repair recommendations developed by the authors were widely approved by the construction team.
机译:由于担心混凝土均匀性和施工过程中地表水的存在,超高层塔基础的建设于2016年10月暂停。基础设计包括一个四米厚的钢筋混凝土转移垫,该垫位于136个钻孔混凝土墩的网络上。作者被保留为第三方顾问,以独立评估竣工条件并协助承包商和设计师制定维修计划。该调查于2016年12月开始,包括从转印垫中提取岩心的文件以及有效确定岩心孔内条件的程序的开发。施工团队特别关注的是制定一个具有足够代表性的采样计划,混凝土接头的相对剪切强度和性能以及评估转移垫内的腐蚀潜能。制定了维修转移垫受影响位置的计划,以解决调查期间确定的条件的性质和类型。作者提出的维修建议得到了施工队的广泛认可。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号