Impact of Adjacent Construction on Existing Building

机译:邻近建筑对既有建筑物的影响

获取原文

摘要

This paper presents a case study of a two-story unreinforced brick masonry building that was adversely impacted by construction activity associated with the development of an adjacent high-rise building. One longitudinal exterior wall of the URM building was located along the property line where the construction activity for the new building occurred. The new construction extended several levels below grade requiring support of excavation along the property line. The excavation was shored with a system of soldier beams cast in drilled shafts, raker beams, and lagging that also served as the formwork for the basement retaining walls of the new structure. However, the excavation activity disturbed the equilibrium of the URM building and caused settlement of its longitudinal exterior wall foundation, which resulted in cracking of the exterior walls, settlement of the floor slab-on-grade, and other distress to the URM building. The potential for damage to the URM building was mitigated to some extent because of a prior seismic retrofit, which tied the second floor and roof diaphragms to the building walls. Photographs taken during a pre-construction survey of the URM building confirmed that cracking of the URM building occurred after commencement of adjacent construction. Details of the investigation performed to determine the cause of distress to the URM building are described in this paper. The intensity of vibrations induced by shaft drilling and their attenuation with distance was also assessed through a desktop study to complement the findings. The measures adopted to remediate damage to the URM building with the added constraint of adjacent construction are also discussed in this paper.
机译:本文介绍了一个两层无钢筋砖砌建筑的案例研究,该建筑受到与相邻高层建筑开发相关的建筑活动的不利影响。 URM大楼的一面纵向外墙沿物业线位于新大楼的建筑活动发生处。新建筑将地平面下延伸了几个等级,需要沿物业线的挖掘进行支撑。基坑的开挖是通过在钻孔竖井,耙杆梁和衬砌中浇筑的士兵横梁系统完成的,该系统也用作新结构地下室挡土墙的模板。但是,开挖活动扰乱了URM建筑物的平衡,并导致其纵向外墙基础沉降,从而导致外墙开裂,地面楼板沉降以及其他对URM建筑物的困扰。由于先前的地震改造将第二层和屋顶隔板连接到建筑物墙壁上,因此在一定程度上减轻了对URM建筑物造成损坏的可能性。在对URM建筑物进行施工前调查时拍摄的照片证实,URM建筑物的开裂是在相邻建筑开始后发生的。本文描述了为确定URM大楼的故障原因而进行的调查的详细信息。还通过一项台式研究评估了竖井钻孔引起的振动强度及其随距离的衰减,以补充研究结果。本文还讨论了在邻近建筑的额外约束下补救URM建筑损坏的措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号