首页> 外文会议>IEEE International Conference on Power and Energy >Market Based Criteria for Transmission Expansion planning
【24h】

Market Based Criteria for Transmission Expansion planning

机译:基于市场的传输扩展规划标准

获取原文

摘要

In this paper, first, two new criteria, which are titled social welfare percent (SWP) and congestion cost percent (CCP), are defined for static transmission expansion planning in restructured power systems. Then by a simple example it will be shown that none of the already presented market-based criteria could completely and truly evaluate the transmission network expansion from market view. Hence the SWP and CCP criteria altogether are proposed to completely and truly evaluate the transmission network expansion. Then a least-investment cost expansion plan is searched that its SWP and CCP are in predefined acceptable limits. The results of applying of the proposed method are illustrated over a typical 8-bus power system.
机译:本文首先,两个新标准,标题为社会福利百分比(SWP)和拥塞成本百分比(CCP),用于重组电力系统中的静态传输扩展规划。然后,通过一个简单的例子,将显示已经呈现的基于市场的标准中没有一个可以完全和真正评估来自市场视图的传输网络扩展。因此,提出了完全和真正评估传输网络扩展的SWP和CCP标准。然后搜索最小投资成本扩张计划,其SWP和CCP处于预定义的可接受限制。施加所提出的方法的结果在典型的8总线电力系统上示出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号